Developer: Satom SA
Place: Monthey
Project: system for feeding the waste silo and furnace lines
Year of construction: 1st stage: 2009-2010; 2nd stage: 2014
In two construction stages, Satom SA implemented two conveyor belt lines for the direct feed of the waste silo and the two incinerators with shredded combustible waste and biomass.
Developer: Satom SA
Place: Monthey
Project: system for feeding the waste silo and furnace lines
Year of construction: 1st stage: 2009-2010; 2nd stage: 2014
Project
Frei Fördertechnik AG implemented the conveyor system for the feeding of the waste silo and the two furnace lines in two construction phases. In the 1st stage, the supply of biomass and shredded waste was installed directly in the waste silo. To maintain operation even during the necessary refurbishment of the waste silo, a direct feed of the two furnace lines was planned. It was then implemented through the expansion and conversion of the existing conveyor system. The installation work was completed on schedule in December 2014.
Special features
Technical data
Feed material: shredded municipal waste, biomass, hospital waste
Feed capacity: 400 m3/h = 200 t/h
Feed sizes: 0 – 300 mm
Installed components: 6 conveyor belts in total, of which 3 shuttles and 1 reversing conveyor, fire damper, steel and sheet metal constructions