Ortsbürgergemeinde Niederlenz

The processing plant was modernised and renewed under the aegis of Niederlenz municipality. In the process, the existing circular side was demolished and rebuilt, the chippings section renewed, and the connection to the concrete plant re-established.

Client: Sand and gravel plant of Niederlenz municipality

Place: Niederlenz

Project: new construction and refurbishment of the Niederlenz gravel plant

Year of construction: 2011

Project
As general contractor, Frei Fördertechnik AG took on the implementation of the entire new construction and refurbishment of the Niederlenz gravel plant.

Special features

  • Maintaining operations at the gravel plant during the entire construction period
  • Only 20 weeks between shutdown of the old gravel plant and test run of the new gravel plant
  • Perfect operation of the gravel plant after a short trial period

Technical data

Feed material: gravel, 0 – 120 mm (pre-screening with 100 mm)

Plant feed capacity: 60 t/h, 0 – 100 mm

Throughput capacity, crushing plant: 50 t/h

Loading capacity (truck, concrete plant): 320 t/h

Installed power: 590 kW

Water circulation volume: 150 m3/h

Final product, chippings: 0/3; 3/6; 6/11; 11/16; 16/22; 50/100

Final product, round: 0/4; 4/8; 8/16; 16/32; 32/50

Installed machinery (selection): trough feeder, impact crusher, circular, elliptical and drainage screens, dedusting system, drum washing machine (existing), cyclone plant, sand trap, belt feeders, truck and belt scale, bucket scale, truck loader