Conveyor technology for perfect stockpiling - Frei Fördertechnik AG was commissioned with the planning, realisation, assembly and commissioning of the new covered component storage facility. The system is used to store the processed excavated, concrete and mixed demolition components.
- Client/builder
- BM Betonwerk Malters AG
- Location
- Malters
- Project
- Component store and material conveyor system
- Year of construction
- 2024
- Sector
- Building materials (Non-metallic minerals / Recycling)
Project
A new steel structure for material transfer was installed adjacent to the existing concrete plant. A lattice conveyor belt transports the material centrally to the component store. This contains an H-conveyor belt carriage for feeding the 8 concrete silos. The complete plant will go into operation at the beginning of 2025.
BM Betonwerk Malters AG produces and supplies high-quality building materials such as concrete and gravel as well as New Jersey elements and concrete blocks. It also closes the building materials cycle through environmentally friendly recycling and disposal.
Special features
- Distribution plant with two travelling cross conveyor belts with access
- Access via external stairs and safety equipment
- Support tower extension to existing concrete plant
- Silo volume: 9,200 m³
Technical data
- Feed material
- Gravel and sand washed, mixed and concrete rubble washed
- Conveying capacity
- 250 t/h
- Installed capacity
- 30 kW
- End products
- 0/4, 4/8, 8/16, 16/32
- Installed machines (selection)
- Conveyor system, steel and sheet metal construction