Sustainable modernisation at the Untervaz cement works

All projects

As part of its sustainability strategy, Holcim (Switzerland) AG is carrying out a comprehensive modernisation of its cement works in Untervaz. The aim is to reduce CO₂ emissions, optimise resource use and further expand the production of the environmentally friendly Susteno cement. Drawing on its high level of technical expertise and many years of experience, Frei Fördertechnik AG was commissioned to modify existing plant components and to plan and implement the new feeding system for the RC mix granules.

  • Holcim Untervaz 2
  • Holcim Untervaz 1
  • Holcim Untervaz 3
  • Holcim Untervaz 4
Client/builder
Holcim (Schweiz) AG
Location
Untervaz
Project
Refurbishment and expansion of the cement plant
Year of construction
2025
Sector
Building materials (Non-metallic minerals / Recycling)

Project

A pioneering project for resource efficiency, the circular economy and CO₂ reduction

As part of its sustainability strategy, Holcim (Switzerland) AG is carrying out a comprehensive modernisation of its cement plant in Untervaz. The aim is to reduce CO₂ emissions, optimise resource use and further expand the production of the environmentally friendly Susteno cement.

Working closely with qualified partners, a challenging project to refurbish and repurpose existing plant has been successfully completed.

At the heart of the project is the integration of RC mix granules with a grain size of 0–22 mm into the existing production process. To this end, an existing, large-volume concrete bunker with a Luisen discharge system was refurbished and fitted with a new dust cover and a dust extraction filter system. In addition, a new storage, transport and dosing system was installed and successfully commissioned.

This plant modernisation creates the conditions for efficiently integrating RC aggregate into the production process, thereby making a further contribution to resource conservation and the reduction of CO₂ emissions.

Technical implementation by Frei Fördertechnik

Drawing on its high level of technical expertise and many years of experience, Frei Fördertechnik AG was commissioned to modify existing plant components and to plan and implement the new feeding system for the recycled aggregate granules.

The particular challenge here lay not solely in the planning and design of the new conveyor system. Rather, the aim was to integrate the new system seamlessly into the complex existing infrastructure. This required the existing conveyor routes, system components, spatial conditions and control systems to be taken into account and optimally coordinated with one another.

Through careful planning and close coordination of all interfaces, it was possible to implement a technically sophisticated solution that is optimally integrated into the existing production process.

Scope of work in detail

  • Design and supply of a new conveyor belt system

  • Weighing belt and silo weighing system for precise dosing and control

  • Integration of a new bucket elevator with a height of almost 30 m and a modern silo

  • Dust extraction system to reduce emissions and improve the working environment

  • Feed chute for efficient material feeding by lorry

  • Air cannons to prevent material build-up

  • Overhead magnetic separator to remove foreign matter

  • Integration of an Airscrape system for efficient cleaning and sealing of the conveyor belt, as well as to reduce material losses and dust emissions

Specific challenges and solutions

A key challenge of the project was the installation and commissioning of the new plant components whilst the factory remained in operation. To minimise the impact on production processes, the work was carried out in several stages, each lasting three to four days.

Integrating the new conveyor technology into the existing, spatially complex and highly interlinked plant structure proved particularly challenging. The task involved carefully taking into account the existing plant components and their technical specifications, integrating the new components optimally, and coordinating all interfaces with the existing control and conveyor systems.

The AirScrape system was also implemented as an innovative solution to optimise conveyor belt operation. This supports controlled material handling and helps to reduce material losses and dust emissions in the vicinity of the conveyor belt.

The interplay of refurbishing existing facilities, constructing new plant, engineering and integration whilst production continued placed high demands on planning, coordination and execution. Particularly in such complex refurbishment projects, in-depth knowledge of conveyor technology, a thorough understanding of the existing plant structure and forward-looking planning are crucial to the project’s success.

Sustainability and the circular economy

Through the use of mixed aggregate (CDM) from demolition projects, mineral raw materials are returned to the production cycle. The processed material serves both as a cement raw material and as a clinker substitute, and is used in the production of the sustainable cement type Susteno.

The modernised plant thus makes an important contribution to the circular economy and supports the resource-efficient use of natural mineral raw materials. At the same time, it promotes the material recycling of demolition waste and lays the foundations for sustainable cement production.

Through the extensive modifications and the integration of new conveying and dosing technology, Frei Fördertechnik AG is helping to further develop Susteno production in an efficient, resource-conserving and forward-looking manner.

The precise coordination of the various trades, the sophisticated engineering work and the successful implementation whilst the plant remained in operation make this project a technically sophisticated and sustainable overall solution.

Technical data

Feed material
Mixed aggregate (CDM) from demolition, mixed granulate 0–22 mm
Conveying capacity
up to 250 t/h
Installed power
45 kW
End products
Supply and dosing of the feed material for Susteno production (limestone substitute)
Machinery / components installed (selection)
Conveyor system, feed chute, bucket elevator, silo, weighing belt, dust extraction system, air cannons, overhead magnetic separator, Airscrape system