to homepage to main navigation to main content to contact form
Frei Fördertechnik AG
Frei Fördertechnik AG
Schwarzbachstrasse 26
3113 Rubigen, CH
+41 31 720 56 56
info@ffag.ch
No results found
No results found

Makies AG

All projects

16 tonnes for the perfect wash - After 40 years of reliable operation at Makies AG in Gettnau, the time has come to replace the entire washing drum. Frei Fördertechnik AG was commissioned with the replacement.

  • Steine Erden Makies 01
  • Steine Erden Makies 02
Client/builder
Makies AG
Location
Gettnau
Project
Gravel washing drum replacement
Year of construction
2023
Sector
Building materials (Non-metallic minerals / Recycling)

Project

The gravel and concrete plant was founded in 1981. It is connected to the public railway network. All cement deliveries, around 70% of wall gravel deliveries and around 60% of processed materials are delivered or removed by rail.

The plant is equipped with state-of-the-art technology. The production of gravel, crushed stone and concrete products takes place within a closed water cycle.

In recent years, Frei Fördertechnik AG has already realised various systems for Makies AG, such as screening machines, sand dewatering, sword washing and crushers. In 2023, we delivered a new gravel washing drum and a new cone crusher, which are now doing their job well.

Special features

  • Best possible washing process thanks to the use of a gravel washing drum developed in-house
  • Drum body customised to customer requirements with support rings

Technical data

Feed material
Excavated and RC materials, 0 - 250 mm
Plant feeding capacity
100 t/h
Installed capacity
700 kW
End products
0/1, 0/4, 4/8, 8/16, 16/32, 32/45, 45/80
Water circulation volume
Total 460 m3/h

Contact person