to homepage to main navigation to main content to contact form
Frei Fördertechnik AG
Frei Fördertechnik AG
Schwarzbachstrasse 26
3113 Rubigen, CH
+41 31 720 56 56
info@ffag.ch
No results found
No results found

Landor AG

All projects

Birsfelder Auhafen, a hub on the Rhine river, connects river, rail and road, making for optimal conditions for simple and inexpensive logistics. The unloading station of Landor AG was refurbished for the unloading of cargo ships with power shovels to the new silo with batch feed belt (year of construction 2013). In 2023 we are building a conveyor system in the port of Muttenz to link up with the fertiliser warehouse.

  • Landor 1
  • Landor 2
  • Landor 3
Client/builder
Landor AG
Location
Auhafen, Birsfelden
Project
Batch feed belt/curved conveyor belt / conveyor system
Year of construction
2023
Sector
Industry

Project

Project 2013

As subcontractor, Frei Fördertechnik AG was responsible for the belt feeding and the curved conveyor belt. The pipe conveyor was replaced by a newly designed curved conveyor belt. The silo discharge with the belt feeder and the curved conveyor is the interface to the existing silo distribution system. The belt feeder is reversible for railway loading or loading in the existing feeding hopper with distribution system.

Project 2023

The scope of supply includes engineering, production and installation of the conveyor system. A total of 155 m of conveyor belts, one trolley and two platforms will be installed. In addition, adaptations are being made to the existing conveyor technology. The installation is being carried out under difficult conditions on lifting platforms under the existing roof.

Special features

  • Special frameworks for curved conveyor upwards due to the space available for the rail transport: vertical clearance 5 metres, support width 38 or 42 metres, turning radius R400 metres
  • Cover and catwalk made of special PVC
  • Drive, tension drum, rollers, feed hopper and transfer station made of V2A material
  • Two-component epoxy resin, total layer thickness 200 µ
  • Installation work during ongoing railway operation

Click here for the video.

Technical data

Feed material
various fertilisers
Plant feed capacity
350 t/h, controllable
Loading capacity
650 t/h, controllable
Installed power
35.5 kW
Belt feeder
Belt width 1,000 mm, reversible
Curved conveyor belt
Belt width 800 mm, AA 185 m

Contact person