Modernisation & integration of new components – Frei Fördertechnik AG was commissioned with the planning, implementation, installation and commissioning of the truck loading and material feeding systems, as well as the dismantling of the old systems.
- Client/builder
- Holcim (Switzerland) AG
- Location
- Brunnen
- Project
- Modernisation of truck loading & material feeding
- Year of construction
- 2023
- Sector
- Building materials (Non-metallic minerals / Recycling)
Project
Holcim's extraction area in Brunnen covers around 21 hectares and is divided into a gravel plant, material storage area, quarry and concrete plant. In connection with the construction of the ‘N4 Neue Axenstrasse’ motorway, which crosses the Holcim site in Brunnen, extensive adjustments had to be made to the traffic management system on the factory premises and at the processing plants.
These adjustments included the conversion of the loading facilities at gravel plants 1 and 2. In addition, the truck loading facility at gravel plant 2 was modernised. The truck loading facility at gravel plant 1 was dismantled. A feed chute was installed to feed the dosing and loading facility from the external depot or from trucks.
Special features
• Loading capacity: 600 t/h
• Extensive dismantling work
• Integration of new components into existing plants
• 35 m³ feed chute with partially passable grate
Technical data
- Feed material:
- Limestone, grit, gravel
- Machines installed (selection):
- Conveyor belts, feed chute, dosing device, drainage slide, compulsory mixer, air cannon, sheet metal and steel construction