Flughafen Zürich AG

All projects

In addition to the design and finish of the system, user-friendliness plays a crucial role. With an average of 24 million passengers annually, demands on the equipment are extremely high.

  • Stueckgueter Foerdertechnik 14
  • Stueckgueter Foerdertechnik 13
  • Stueckgueter Foerdertechnik 14
  • Stueckgueter Foerdertechnik 12
Client/builder
Flughafen Zürich AG
Location
Kloten-Zürich
Project
Roller conveyors and tables
Year of construction
2011
Sector
Non-Food

Project

In addition to the conceptual development, Frei Fördertechnik AG took over the lines for carry-on luggage inspection in collaboration with Zurich Airport as well as the production of all roller conveyors and metal tables at its factory in Rubigen plus assembly on site.

Special features

  • Coordination of design and safety regulations
  • Determination and implementation of safety solutions at pinch points in front of the indexed conveyor of the X-ray machine
  • Due to electrostatic charge, use of conductive materials (e.g. rollers) and grounding of all roller conveyors
  • Tight schedule with short time windows for product delivery and assembly on site

Technical data

Conveyed goods
Carry-on luggage
Roller conveyor width
600 mm
Roller conveyor lengths
Various
Roller diameter:
50 mm
Roller distance
62,5 mm
Installed elements
Roller conveyors, curved roller conveyors, metal tables, partitions