Optimal connection with 1.2 km of conveyor technology – The newly implemented conveyor technology connects the two plants in Gunzgen and Boningen. This eliminates the need for truck journeys on the road network.
- Client/builder
- Baustoffzentrum Olten / Zofingen BOZ
- Location
- Boningen / Gunzgen
- Project
- Conveyor technology connection
- Year of construction
- 2022
- Sector
- Building materials (Non-metallic minerals / Recycling)
Project
The Olten/Zofingen Building Materials Centre (BZO) is one of the leading suppliers to the regional construction industry. Thanks to resource-saving, short transport routes and the closing of material cycles, BOZ helps to make our society more sustainable.
The newly implemented conveyor technology connects the two plants in Gunzgen and Boningen. This connection ensures that the plant in Boningen is optimally supplied. 1.2 km of conveyor technology was installed. This eliminates the need for truck journeys on the road network.
Frei Fördertechnik already supplied the entire conveyor system for the BOZ Olten/Zofingen in 2019.
Special feature
- Curved belt with a curve radius of 320 m
Technical data
- Feed material
- Gravel components 0/4, 4/8, 8/16, 16/32, 32/45
- Conveying capacity
- 400 t/h
- Installed power
- 220 kW
- Machines installed (selection)
- Dosing devices, conveyor belts, curved and distribution belts