Client/developer: Eberhard Bau AG
Place: Oberglatt
Project: BAZO processing plant
Year of construction: 2010
This complex system has the purpose of processing heavily contaminated soils and ridding them of contaminants. Material, e.g. from the special landfill in Kölliken, can thus be recycled as secondary raw material or disposed of.
Client/developer: Eberhard Bau AG
Place: Oberglatt
Project: BAZO processing plant
Year of construction: 2010
Project
Frei Fördertechnik AG took on the planning and manufacture of the entire conveyor system as well as the installation and commissioning. Control, conditioning drums, crusher, air purification and ventilation as well as the construction of the building were purchased directly by the customer.
Special features
Technical data
Feed material: 120 t/h; 0 – 600 mm
Throughput capacity, crushing plant 1: 120 t/h
Throughput capacity, crushing plant 2: 120 t/h; 0 – 150 mm
Installed power: 900 kW
End products: iron; lightweight fraction 0/8; 8/32; 32/63
Installed machinery (selection): sizer, overbelt magnets, reaction drums, screening machines, windsifter