Client/developer: Eberhard Bau AG / Movie of the new construction site
Place: Oberglatt
Project: EBIMIK, Los 02+03, Dosing system and loading truck and rail
Year of construction: 2021
Eberhard Bau AG extracts high-quality building materials from its modern recycling plant. These are efficiently loaded onto trains and lorries via a dosing system from Frei Fördertechnik.
Client/developer: Eberhard Bau AG / Movie of the new construction site
Place: Oberglatt
Project: EBIMIK, Los 02+03, Dosing system and loading truck and rail
Year of construction: 2021
Project
Frei Fördertechnik AG was responsible for the planning, implementation planning, implementation, assembly and commissioning of the dosing and loading system.
During all phases of the project, good cooperation with the customer was the key. The system was planned in a very short time and the installation was completed in only four months. This meant that the plant was commissioned on time in August 2021.
Special features
Technical data
Feed material: Mixed demolition of building materials, 0 – 32 mm
Loading capacity: 800t/h
Installed power: 603 kW
End products: 0/2, 2/4, 4/8, 8/16, 16/32
Installed machinery (selection): Dewatering slide gate, Dosing system with 28 dosing units, Rotating and reversible conveyor belt, Double belt conveyor