Eberhard Bau AG extracts high-quality building materials from its modern recycling plant. These are efficiently loaded onto trains and lorries via a dosing system from Frei Fördertechnik.

Project 
Frei Fördertechnik AG was responsible for the planning, implementation planning, implementation, assembly and commissioning of the dosing and loading system.

During all phases of the project, good cooperation with the customer was the key. The system was planned in a very short time and the installation was completed in only four months. This meant that the plant was commissioned on time in August 2021.

Special features

  • Loading capacity max. 800 t/h
  • Continuous loading onto rail
  • Loading capacity truck: 20 loads per hour à 15 m³
  • Loading capacity by rail: 12 loads per hour of 40 m³ each

Technical data

Feed material: Mixed demolition of building materials, 0 – 32 mm

Loading capacity: 800t/h

Installed power: 603 kW

End products: 0/2, 2/4, 4/8, 8/16, 16/32

Installed machinery (selection): Dewatering slide gate, Dosing system with 28 dosing units, Rotating and reversible conveyor belt, Double belt conveyor