Client/developer: Eberhard Bau AG / Movie of the new construction site / Press release
Place: Oberglatt
Project: EBIMIK, Los 01, Construction waste treatment
Year of construction: 2021
New construction of the building material mixed demolition treatment EbiMIK LOS 01 Oberglatt for sustainable "urban mining" with a closed loop. State-of-the-art crushing and screening plants with a sophisticated robot sorting line provide the first stage of a state-of-the-art building material recycling plant.
Client/developer: Eberhard Bau AG / Movie of the new construction site / Press release
Place: Oberglatt
Project: EBIMIK, Los 01, Construction waste treatment
Year of construction: 2021
Project
For this order, Frei Fördertechnik AG took over the Planning, implementation, installation and commissioning of the building material Mixed discontinuation treatment plant. It is here
the first stage of a sophisticated building material recycling plant.
Special features
Technical data
Feed material: Mixed demolition of building materials, 0 – 1200 mm
Installed power: 910 kW
End products: Mixed demolition 0 – 32 mm
Installed machinery (selection): Robot sorting track, Two-roller crusher, Electro-overband magnets, Impact crusher, Screening machines, Conveyor belts, Slotted bunker discharge gutters, Vibration gutts, Dust collector, Conveyor belts, Control
Fritz Rothenbühler
Mitglied der Geschäftsleitung, Leiter Service
Telefon +41 31 720 56 44
Mobile +41 79 236 72 54
f.rothenbuehler@ffag.ch