DE FR EN
phone +41 31 720 56 56 phone Jobs Downloads
back

Eberhard Bau AG - EBIMIK Oberglatt, LOS 01

New construction of the building material mixed demolition treatment EbiMIK LOS 01 Oberglatt for sustainable "urban mining" with a closed loop. State-of-the-art crushing and screening plants with a sophisticated robot sorting line provide the first stage of a state-of-the-art building material recycling plant.

Project 
For this order, Frei Fördertechnik AG took over the Planning, implementation, installation and commissioning of the building material Mixed discontinuation treatment plant. It is here
the first stage of a sophisticated building material recycling plant.

Special features

  • Two-roller crusher with feed and acceptance gutters
  • Handovers for reinforced concrete quarry, heaviest version
  • Silo discharge with slotted gutters for concrete quarrying
  • ZEN robot sorting track, continuous task
  • Displacement measuring system for filling the warehouse

Technical data

Feed material: Mixed demolition of building materials, 0 – 1200 mm

Installed power: 910 kW

End products: Mixed demolition 0 – 32 mm

Installed machinery (selection): Robot sorting track, Two-roller crusher, Electro-overband magnets, Impact crusher, Screening machines, Conveyor belts, Slotted bunker discharge gutters, Vibration gutts, Dust collector, Conveyor belts, Control

Contact person

Fritz Rothenbühler
Mitglied der Geschäftsleitung, Leiter Service

Telefon +41 31 720 56 44
Mobile +41 79 236 72 54
f.rothenbuehler@ffag.ch