Client/developer: Baustoffe Schollberg AG
Place: Trübbach
Project: chipping processing and gravel loading
Year of construction: 2011
Baustoffe Schollberg AG produces high-quality limestone from underground mining. The new treatment plant is fed directly with a cleat conveyor and includes sifting, crushing and loading of the gravel components.
Client/developer: Baustoffe Schollberg AG
Place: Trübbach
Project: chipping processing and gravel loading
Year of construction: 2011
Project
Fördertechnik AG implemented this project in two stages. The batch feed device, gravel loading station with loading device as well as the associated controlling and electric systems were planned and implemented in the first stage in the spring. The second stage of construction in the autumn comprised the conveyor system at the pre-crushing station, the cleat conveyor to the processing plant, the chippings sizing with connection to the existing secondary crushing unit as well as the addition of control units and the electrical system.
Special features
Technical data
Feed material: limestone, grain size 0 – 150 mm
pre-screening: with 63 and 100 mm
Plant feed capacity: 250 t/h
Capacity, chippings sizing: 200 t/h
Loading capacity: 600 – 800 t/h
Final product, chippings: 0/16; 0/3; 3/6; 6/16; 16/32; 32/42; 42/65
Installed machinery: circular motion vibrating screening machines, sizer, conveyor belts, belt feeders, gate valves, loading chute for wet loading, loading device for dry loading