Client/developer: ARGE MBR LOS 4.0
Place: Rosshäusern
Project: Gravel processing plant
Year of construction: winter 2012-2013
The section of railway between Bern and Neuchatel is being widened to a double track in stages. From 2012 to 2018, it's the turn of the section between Rosshäusern and Mauss. The key component is the construction of the new Rosshäusern tunnel, with a length of two kilometres, for which a gravel processing plant will be built directly on site.
Client/developer: ARGE MBR LOS 4.0
Place: Rosshäusern
Project: Gravel processing plant
Year of construction: winter 2012-2013
Project
As general contractor, Frei Fördertechnik AG took on the planning of the plant feed, processing and water circulation as well as all plant sections for this contract. The batch feed channel and the concrete centre were installed by the client as used equipment.
Special features
Technical data
Feed material: gravel, 0 – 250 mm (with screening)
Plant feed capacity: 100 t/h, 0 – 45 mm
Gravel processing: 555,000 t (estimated total volume)
Installed power: 655 kW (including concrete plant and belt feed tunnel)
Water circulation volume: max. 150 mm3/h
Final product, round gravel: 0/4; 4/8; 8/16; 16/32; 32/45
Installed machinery (selection): turbo washer, sand screw, sewage treatment plant with chamber filter press, screening machines, cyclone
Fritz Rothenbühler
Mitglied der Geschäftsleitung, Leiter Service
Telefon +41 31 720 56 44
Mobile +41 79 236 72 54
f.rothenbuehler@ffag.ch